欢迎光临散文网 会员登陆 & 注册

Bratislava port eyes LNG terminal

2021-05-10 15:20 作者:_多言数穷  | 我要投稿

奥地利和斯洛伐克边界,LNG 液化站,不知道Capacity, 2026年上

The idea is to produce LNG at a site on the river and use it for fueling river boats.  They will also fill LNG trucks for distribution inland.

One thing not mentioned in the article is where the gas is coming from that will be made into LNG.

---------------------

A liquefied natural gas (LNG) terminal, which will cost approx €40 million, is being built in a public port in Bratislava, Slovakia.

The development of the LNG terminal in the public port of Bratislava is currently in the preparation phase, the port informed in its statement.

The LNG terminal will be located on the main course of the Danube and will span 5,500 square metres.

The LNG terminal will consist of facilities for LNG production, for refueling of road tanks, for LNG storage, and for bunkering of ships.

By supporting the introduction of infrastructure for alternative fuels, the project wants to reduce greenhouse gas emissions and contribute to the greening of the port. This is a part of the EU plan to build the Rhine-Danube transport corridor, which aims to make transport greener.

The feasibility study published by the Slovak Republic’s Public Ports identifies the most suitable technology for the production and distribution of LNG for the port, based on a comparison of available technologies for liquefaction and storage of LNG on the market.

The construction is expected to begin next year, with completion expected in 2026.

Public Ports estimated the cost of building the terminal at around €40 million ($48.3 m) excluding VAT.


Bratislava port eyes LNG terminal的评论 (共 条)

分享到微博请遵守国家法律