欢迎光临散文网 会员登陆 & 注册

Renewal-Zone:时序演绎︱伊皮兰加博物馆现代化更新修复

2023-06-05 13:27 作者:REARD锐地星设计  | 我要投稿

打开www.RENEWAL-ZONE.com了解更多



© H+F ARQUITETOS


项目的一系列干预手法非常低调,总体目标并非增设全新形象,而是通过连接、空间布局和新的路径以全新方式谨慎诠释已有内容。新元素的重点落于效能而非外观,专注于对既有内容的激活和增强方面的有效提升。


© Alberto Ricci

© Alberto Ricci

© Alberto Ricci


首项行动计划的重点在于恢复既有建筑物理上的完整性,并进行修复和现代化更新。同时项目打造了一座新的综合性补充结构,将一座功能完善的现代博物馆所需的服务设施和空间涵盖其中。


© Nelson Kon

© Nelson Kon

© Nelson Kon

© Nelson Kon


建筑师将此次扩建构想为既有建筑在地下的延伸空间,而非附属结构;这反过来拓展了以更有力的方式将博物馆和公园连接的可能性,一条延伸至爱国者街的全新散步道也由此打造而成。


© Nelson Kon

© Nelson Kon

© Nelson Kon



© H+F ARQUITETOS


The set of proposed interventions does not want to be highlighted. The general objective is not to impose the face of the new, but to reveal in a new way what is already there, through articulations, spatial dispositions and new paths that the interventions discreetly provide. The emphasis of the new elements does not reside in their appearance, but in their performance, in what they are capable of promoting, in their effectiveness in dynamizing and enhancing the virtues of the preexisting ones.


© Alberto Ricci

© Alberto Ricci

© H+F ARQUITETOS


The first action plan focuses on works to recover the physical integrity and rehabilitation/modernization of the existing building, as well as the creation of a new, complementary and integrated sector, containing most of the services and areas necessary for the full functioning of a contemporary museum.


© Nelson Kon

© Nelson Kon

© Nelson Kon


We sought to conceive this expansion not as an annex or appendix, but as an underground extension of the pre-existing building which, in turn, opens up the possibility of connecting the Museum to the Park in a more powerful way and configures a new access esplanade, which extends all the way to Patriotas Street.


© Nelson Kon

© Nelson Kon

© Nelson Kon

© H+F ARQUITETOS


Project: 2017-2019 / Construction: 2020-2022

Site area: 100,000 ㎡ / Built area: 16,338.80 ㎡

 

ARCHITECTURE AND GENERAL COORDINATION: H+F ARQUITETOS - Eduardo Ferroni e Pablo Hereñú (Coord.), Camila Omiya , Camila Paim, Felipe Maia, Josephine Poirot Delpech, Leonardo Bonfim, Lúcia Furlan, Luna Brandão, Levy Vitorino, Maria Beatriz Souza, Marina Uematsu , Mateus Loschi , Sofia Toi, Stephanie Galdino;

 

RESTORATION: OAR (Project) and PAULICÉIA (construction supervision) - Olympio Augusto Ribeiro (Coord.); Griselda Klüppel , Anna Beatriz Ayroza Galvão; Mita Ito; Michele Amorim, Naiara Amorim Carvalho, Vivian Oliveira;

 

STRUCTURES: Companhia de Projetos

FOUNDATIONS AND GEOTECHNICS: MAG Engenheiros Associados / Nouh Engenharia

HYDRAULIC AND ELECTRICAL INSTALLATIONS: Ramoska & Castellani Projetistas Associados Ltda.

AUTOMATION AND SECURITY: Bettoni Automation, Security and Consulting

MECHANICAL FACILITIES / AIR CONDITIONING: THERMOPLAN Thermal Engineering

LANDSCAPING: Raul Pereira Arquitetos Associados

LIGHT DESIGN: Lux Projetos

EXPOGRAPHY DESIGN: Metrópole Arquitetos

CONSERVATION CONSULTANCY: Claudia Carvalho

FIRE FIGHTING AND PREVENTION: FEUERTEC Engenharia

ENVIRONMENTAL COMFORT: Greenwatt

ACOUSTICS: Harmonia Acústica

DOOR AND WINDOW CONSULTANCY: Dinaflex / Pedro Martins

ACCESSIBILITY CONSULTANCY: Elisa Prado

WATERPROOFING: Proassp Assessoria & Projetos

HISTORICAL RESEARCH: Advisory Memories and Projects

VEGETATION MANAGEMENT: CBFT

VERTICAL CIRCULATION: EMPRO Engenharia

EARTHWORKS: Estudio Piza Engenharia, Arquitetura e Urb.

LEGAL APPROVAL: Maia e Martines Arquitetura e Design

VISUAL COMMUNICATION: CLDT

GENERAL MANAGEMENT: FUSP

PROJECT AND CONSTRUCTION MANAGEMENT: SETEC

CONSTRUCTION: CONCREJATO Engenharia

 

PHOTOS: Nelson Kon and Alberto Ricci (Drone)




·  END  ·



Renewal-Zone:时序演绎︱伊皮兰加博物馆现代化更新修复的评论 (共 条)

分享到微博请遵守国家法律